Cogeneration

Bagasse based Co-generation Project :-

bullets  T.G.Sets :-

6 MW 16 MW
Back Pressure Double Extraction cum condensing Turbine.

bullets  Boiler :-

Capacity : 120 TPH

Pressure : 87 Kg/Cm2

Temperature : 5150C ± 50C

bullets  Season Operation :-

Total Power Generation : 21600 KW

Captive power for sugar factory : 5060 KW

Captive power for co-gen. : 1760 KW

Export power : 14680 KW

bullets  Off Season Operation :-

Total Power Generation : 16000 KW

Captive Power for Co-gen. : 1760 KW

Export Power : 14240 KW

bullets  Switch Yard :-

Capacity : 25 MVA